Goodsoal Farm

Best Demolition were recently contracted as part of a 5 million pound redevelopment of an old farm house, these works included the demolition of the main farm house to include working closely with the Bat Conservation Consultants to verify the presence of bats and bat roosts. Carefully cutting away and retaining the two Oast’s at one end, salvaging all the tiles and reusable oak timber, all hardcore and concrete arising on site were crushed and stockpiled for re-use as part of the new development.

Nursing Home

Partial demolition of a four storey nursing home, which was to include the careful separation from the building that was to remain, hardcore materials were crushed, stockpiled and remained on site for reuse for the new project.

Demolition works at a pharmaceutical
factory in Sussex

Due to the close proximity of sensitive weighing equipment the roof structure of the building needed to be disconnected. These works were carried out using robotic micro breakers. Once separated the remainder of the structure could be sheared down without any inconvenience to the normal running of the factory. The building was demolished to make way for a new packaging hall.

Farley Bank

This contract was carried out for a Housing Association as part of a local regeneration plan.

Click images for slideshow